Facilities :
The factory building is been constructed in compliance with standard building code after receipt of authentic approval of CDA for six storied state-of-art technology building. It is especially designed for RMG factory keeping the compliance code required for compliance factory setup such as wide space between the pillars, two wide stairs, and adequate windows for proper ventilation.


Factory Building (A ) : 5 ( five) storied
Factory floor : 3 & 4 .
Factory Building - B : 6 ( six ) storied
Factory floor : 1 to 5 .
Factory floor area in Total : 43,800 sft.( Approximate)
Energy , power, machinery :
Water Source : Both WASA and Earth water with proper treatment method.
Electricity : 440 Volt, 510 KW HT ( 11000 KV High Tense) line.
Emergency Power Backup : Brand new diesel powered generator of 275 KVA Capacity assembled in Uk with Volvo engine and Mecallte Alternator.
Electrification : Over head aluminum channel line in compliance of electrical safety code.


Gas Connection : Application approved and Connection is in process.
Electric Boiler : 16 Iron Capacity electric steam iron line in compliance with electrical safety code.
Equipment : Industrial Exhaust Fan, cleaning materials etc.
Fire Fighting Equipment : Naffco supplied hydrant system & Fire doors , Honeywell manufactured automated fire & smoke detection system
Vehicle : 2 units Toyota car / micro.
Machines : a) Sewing Machines : 365 nos. b) Special Machines : 160 nos.
Our Head Office Address
- Delwar Bhaban ( 5th floor) 104, Agrabad Commercial Area. Chittagong- , Bangladesh.
- Tel : +88 031 2514290, +88 031 2514291.
- Fax :+88 031 2514374
- E-mail: admin_office@vertexgroupctg.com